Tropical Garment
Repaint
Located in Tampa
This was an exterior repaint and sealant replacement as well as epoxy floor coating on the interior floor which had to be completed in 24 hours based on a scheduled shut down. We had 12 people working this floor in two 12 hour shifts each to get it done.